Swiss engine maker WinGD has won a long-term engine service agreement covering three newbuild LNG carriers, sources indicated on 8 October 2026.
The vessels are operated by Athens-based ship manager TMS Cardiff Gas Ltd and were built by HD Hyundai Samho in South Korea. Each newbuild is fitted with two WinGD 5X72DF dual fuel engines, the report states.
The contract is described as a lifecycle support arrangement that will extend WinGD's aftermarket involvement with the engines installed on these tonnage additions. The supplier framed the agreement as reinforcing its long-term service capability for operators using its 5X72DF platform.
The vessels and equipment
According to the supplied report, the three ships are new LNG carriers constructed at HD Hyundai Samho. The specification given for each vessel is two WinGD 5X72DF dual fuel engines, a detail that underpins the service scope covered by the agreement.
A short summary of the core factual details follows:
- Operator: TMS Cardiff Gas Ltd, based in Athens.
- Builder: HD Hyundai Samho, South Korea.
- Engines: two WinGD 5X72DF dual fuel engines per vessel.
- Contract type: long-term engine service agreement covering three newbuild LNG carriers.
Aftermarket support
The assignment of a long-term service agreement reflects the continuing role of OEMs in providing lifecycle support for large two-stroke dual fuel engines. The report positions WinGD's engagement as strengthening that component of its commercial offering.
No financial terms, exact duration or delivery timetable were disclosed in the report provided for verification. The published item confines itself to the technical and contractual headline: the award of the service agreement and the equipment fitted to the newbuilds.
The arrangement links the engine supplier directly with a fleet of recently built LNG carriers for which TMS Cardiff Gas has operational responsibility. The partnership therefore ties together shipbuilding, engine supply and management in a single aftermarket commitment.
reports supplied the report on 8 October 2026 that forms the basis of this account. The factual notes verified for this dispatch are restricted to the contract award, the parties involved, the shipbuilder and the engine model fitted to each of the three newbuilds.
Editor profile